A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

Authors

  • Intan Bazliah Mohd Faculty of Engineering Technology, Universiti Malaysia Pahang, Lebuhraya Tun Razak, 26300 Kuantan, Pahang, Malaysia
  • Abdullah Ibrahim Faculty of Engineering Technology, Universiti Malaysia Pahang, Lebuhraya Tun Razak, 26300 Kuantan, Pahang, Malaysia

Keywords:

simulation, line balancing, assembly line

Abstract

The purpose of this paper is to simulate production line improvement using computerized simulation software. The model is developed based on current state operation system which had been identified to have imbalanced performance between 18 workstations. The paper presents the analysis of simulation model to overcome the stated problems. The findings found that by having balance production system in assembly line will be able to optimize overtime and job performance while eliminating a number of buffer stock (work in progress). The results also encourage the multi-tasking and job rotation which can promote job optimization.

Downloads

Published

2016-06-30

How to Cite

Mohd, I. B., & Ibrahim, A. (2016). A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION. International Journal of Industrial Management, 2(1). Retrieved from https://journal.ump.edu.my/ijim/article/view/10874