Analysis of production planning activities in remanufacturing system
DOI:
https://doi.org/10.15282/jmes.12.2.2018.3.0315Keywords:
used-products; remanufacturing; production planning; simulation.Abstract
This article examines the problem of uncertain quantities and quality conditions of used-products obtained from the customer-stream, third-party-stream & mixed-stream on remanufacturing cycle-time under three different remanufacturing resources policies. Simulation technique is used to model a remanufacturing system with uncertain quantities and quality conditions of used-products obtained from the customer-stream, third-party-stream and mixed-stream under three different remanufacturing resource policies. Findings show that the quantities of used-products either from the customer-stream or third-party-stream affect the remanufacturing cycle-time. For used-products form the mixed-stream, the percentage of used-products from the customer-stream greatly affects the remanufacturing cycle-time. The different remanufacturing resource policies also affect the remanufacturing cycle-time. It can be established and concluded that the performance of a remanufacturing system is affected by the uncertain quantities and quality conditions of used-products.
References
Golinska-Dawson P, Kosacka M, Nowak A. The Survey on the Challenges of Organization of Automotive Component Remanufacturing in Small-sized Companies in Poland. In: Kachitvichyanukul V, Sethanan K, Golinska- Dawson P, editors. Toward Sustainable Operations of Supply Chain and Logistics Systems. Cham: Springer International Publishing; 2015. p. 241-252.
Graham I, Goodall P, Peng Y, Palmer C, West A, Conway P, Mascolo JE, Dettmer FU. Performance measurement and KPIs for remanufacturing. Journal of Remanufacturing. 2015;5:10.
Chaowanapong J, Jongwanich J, Ijomah W. The determinants of remanufacturing practices in developing countries: Evidence from Thai industries. Journal of Cleaner Production. 2018;170:369-378.
Aydin R, Kwong CK, Ji P. A novel methodology for simultaneous consideration of remanufactured and new products in product line design. International Journal of Production Economics. 2015;169:127-140.
Chaowanapong J, Jongwanich J. Sustainable Manufacturing for Thai Firms: A Case Study of Remanufactured Photocopiers. Cham: Springer International Publishing; 2017. p. 245-256.
Oh Y, Behdad S. Simultaneous reassembly and procurement planning in assemble-to-order remanufacturing systems. International Journal of Production Economics. 2017;184:168-178.
Andrew-Munot M, Ibrahim RN. Development and analysis of mathematical and simulation models of decision-making tools for remanufacturing. Production Planning & Control. 2013;24:1081-1100.
Butzer S, Kemp D, Steinhilper R, Schötz S. Identification of approaches for remanufacturing 4.0. 2016 IEEE European Technology and Engineering Management Summit (E-TEMS)2016. p. 1-6.
Golinska- Dawson P, Kosacka M, Nowak A. Automotive Parts Remanufacturing–Experience of Polish Small Companies. CMUJ NS Special Issue on Logistics and Supply Chain 2015;14:415-430.
Zhang R, Ong SK, Nee AYC. A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling. Applied Soft Computing. 2015;37:521-532.
Zikopoulos C. Remanufacturing lotsizing with stochastic lead-time resulting from stochastic quality of returns. International Journal of Production Research. 2017;55:1565-1587.
Seifert S, Burtzer S, Westermann H, Steinhilper R. Managing complexity in Remanufacturing. . In Proc World Congress on Engineering, UK2013.
Andrew-Munot M, Ibrahim RN. Remanufacturing process and its challenges. Journal of Mechanical Engineering and Sciences,. 2013;4:488-495.
Junior ML, Filho MG. Production planning and control for remanufacturing: literature review and analysis. Production Planning & Control. 2012;23:419-435.
Morgan SD, Gagnon RJ. A systematic literature review of remanufacturing scheduling. International Journal of Production Research. 2013;51:4853-4879.
Matsumoto M, Yang S, Martinsen K, Kainuma Y. Trends and research challenges in remanufacturing. International Journal of Precision Engineering and Manufacturing-Green Technology. 2016;3:129-142.
Priyono A, Ijomah W, Bititci U. Disassembly for remanufacturing: A systematic literature review, new model development and future research needs. Journal of Industrial Engineering and Management. 2016;9:899-932.
Lage Junior M, Godinho Filho M. Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies. Production Planning & Control. 2016;27:212-225.
Teunter RH, Flapper SDP. Optimal core acquisition and remanufacturing policies under uncertain core quality fractions. European Journal of Operational Research. 2011;210:241-248.
Jin X, Ni J, Koren Y. Optimal control of reassembly with variable quality returns in a product remanufacturing system. CIRP Annals. 2011;60:25-28.
Karamouzian A, Teimoury E, Modarres M. A model for admission control of returned products in a remanufacturing facility using queuing theory. The International Journal of Advanced Manufacturing Technology. 2011;54:403-412.
Iwao M, Kusukawa M. Optimal production planning for remanufacturing with uncertainty in quality of returns and classification error in quality grading. Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference Osaka2012.
Tao Z, Zhou SX, Tang CS. Managing a Remanufacturing System with Random Yield: Properties, Observations, and Heuristics. Production and Operations Management. 2012;21:797-813.
Mezghani M, Loukil T. Remanufacturing planning with imprecise quality inputs through the goal programming and the satisfaction functions. International Journal of Multicriteria Decision Making. 2012;2:379-390.
Robotis A, Boyaci T, Verter V. Investing in reusability of products of uncertain remanufacturing cost: The role of inspection capabilities. International Journal of Production Economics. 2012;140:385-395.
Zikopoulos C. Remanufacturing lot-sizing under alternative perceptions of returned units' quality. International Journal of Business Science & Applied Management. 2012;7:12-22.
X J, J HS, J N, G X. Assembly Strategies for Remanufacturing Systems With Variable Quality Returns. IEEE Transactions on Automation Science and Engineering. 2013;10:76-85.
Karamouzian A, Naini SGJ, Mazdeh MM. Management of returned products to a remanufacturing facility considering arrival uncertainty and priority processing. International Journal of Operational Research. 2014;20:331-340.
Wei S, Tang O, Sundin E. Core (product) Acquisition Management for remanufacturing: a review. Journal of Remanufacturing. 2015;5:4.
Alqahtani AY, Gupta SM, Nakashima K. Performance Analysis of Advanced Remanufacture-To-Order,Disassembly-To-Order and Refurbishment-To-Order System. Innovation and Supply Chain Management. 2014;8:140-149.
Yang CH, Wang J, Ji P. Optimal acquisition policy in remanufacturing under general core quality distributions. International Journal of Production Research. 2015;53:1425-1438.
Mashhadi AR, Esmaeilian B, Behdad S. Uncertainty Management in Remanufacturing Decisions: A Consideration of Uncertainties in Market Demand, Quantity, and Quality of Returns. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering. 2015;1:021007-021007-021008.
Li X, Li Y, Cai X. On Core Sorting in RMTS and RMTO Systems: A Newsvendor Framework. Decision Sciences. 2016;47:60-93.
Mutha A, Bansal S, Guide VDR. Managing demand uncertainty through core acquisition in remanufacturing. Production and Operations Management. 2016;25:1449-1464.
Yang CH, Bao XY, Song C, Liu HB. Optimal acquisition policy in remanufacturing systems with quantity discount and carbon tax scheme. Tehnički vjesnik. 2016;23:1073-1081.
Yang CH, Liu Hb, Ji P, Ma X. Optimal acquisition and remanufacturing policies for multi-product remanufacturing systems. Journal of Cleaner Production. 2016;135:1571-1579.
Aydin R, Kwong CK, Geda MW, Okudan Kremer GE. Determining the optimal quantity and quality levels of used product returns for remanufacturing under multi-period and uncertain quality of returns. The International Journal of Advanced Manufacturing Technology. 2018;94:4401-4414.
Gavidel SZ, Rickli JL. Quality assessment of used-products under uncertain age and usage conditions. International Journal of Production Research. 2017;55:7153-7167.
Gavidel SZ, Rickli JL. Remanufacturing cost analysis under uncertain core quality and return conditions: extreme and non-extreme scenarios. arXiv preprint arXiv:180110497. 2018.
Zhou J, Deng Q, Li T. Optimal acquisition and remanufacturing policies considering the effect of quality uncertainty on carbon emissions. Journal of Cleaner Production. 2018;186:180-190.
Kelton W, Sadowski R, Zupick N. Simulation with Arena. 6th ed. Singapore McGraw-Hill; 2015.
Lari O, Singh H. Basics of Modelling and Simulation 1ed: S. K. Kataria & Sons; 2015.
Ab Rashid MFF, Mohamed NN, Rose AM, Kor KY. Simulation study of a vehicle production line for productivity improvement. Journal of Mechanical Engineering and Sciences,. 2015;8:1283-1292.
Automation R. Arena simulation software. 15 ed.
Shah P, Gosavi A, Nagi R. A machine learning approach to optimise the usage of recycled material in a remanufacturing environment. International Journal of Production Research. 2010;48:933-955.
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 The Author(s)
This work is licensed under a Creative Commons Attribution 4.0 International License.