A Case Study on the Un-Used Capacity Assessment Using Time Driven Activity Based Costing for Magnetic Components

Authors

  • Nik Nurharyantie Nik Mohd Kamil Faculty of Manufacturing & Mechatronic Engineering Technology, Universiti Malaysia Pahang, 26600 Pahang, Malaysia
  • Sri Nur Areena Mohd Zaini Faculty of Manufacturing & Mechatronic Engineering Technology, Universiti Malaysia Pahang, 26600 Pahang, Malaysia.
  • Mohd Yazid Abu 1Faculty of Manufacturing & Mechatronic Engineering Technology, Universiti Malaysia Pahang, 26600 Pahang, Malaysia

DOI:

https://doi.org/10.15282/ijim.9.0.2021.5954

Keywords:

Time equation, Capacity cost rate, Unused capacity

Abstract

The Electrical & Electronic (E&E) company is one of Malaysia’s leading industries that has 24.5% in manufacturing sector production. With a continuous innovation of E&E company, the current costing being used is hardly to access the complete activities with variations required for each workstation to measure the un-used capacity in term of resources and cost. The objective of this work is to develop a new costing structure using time-driven activity-based costing (TDABC). This data collection was obtained at E&E company located at Kuantan, Pahang that focusing on magnetic component. The historical data was considered in 2018. TDABC is used to measure the un-used capacity by constructing the time equation and capacity cost rate. This work found three conditions of un-used capacity. Type I is pessimistic situation whereby according to winding toroid core, the un-used capacity of time and cost are -14820 hours and -MYR2.60 respectively. It means the system must sacrifice the time and cost more than actual apportionment. Type II is most likely situation whereby according to assembly process, the un-used capacity of time and cost are 7400 hours and MYR201575.45 respectively. It means the system minimize the time and cost which close to fully utilize from the actual apportionment. Type III is optimistic situation whereby according to alignment process, the un-used capacity of time and cost are 4120 hours and MYR289217.15 respectively. It means the system used small amount of cost and time from the actual apportionment.

Downloads

Published

2021-01-03

How to Cite

Kamil, N. N. N. M., Zaini, S. N. A. M., & Abu, M. Y. (2021). A Case Study on the Un-Used Capacity Assessment Using Time Driven Activity Based Costing for Magnetic Components. International Journal of Industrial Management, 9, 32-53. https://doi.org/10.15282/ijim.9.0.2021.5954

Similar Articles

41-50 of 86

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)