Contract Termination in the Construction Industry: A Systematic Literature Review
DOI:
https://doi.org/10.15282/construction.v5i1.11746Keywords:
Contract termination, Construction projects, Causes, Systematic reviewAbstract
Contract termination poses a significant threat to the successful completion of construction projects, with worst-case scenarios leading to project delays or abandonment. Wrongful terminations, particularly in cases where defaults are considered excusable such as the acts of God, can have costly legal consequences. There are several dominant causes of contract termination, and it is essential to recognize potential contractual risks at the earliest opportunity. This study provides a systematic review of contract termination causes in the construction industry across various countries, analysing articles that identified 42 key causes, categorized into financial difficulties, client defaults, contractor shortcomings, economic and marketing factors, and administrative problems, with sub-attributes such as procurement system breaches and regulatory non-compliance. The findings emphasized that contract terminations are often driven by financial mismanagement, unrealistic client expectations, poor contractor performance, and administrative failures. To mitigate these risks, the study recommends enhancing training in contract management practices, improving administrative processes, and fostering stakeholder collaboration to ensure transparency and accountability. The research highlights the need for further investigation into the role of administrative factors in contract termination and provides practical recommendations to enhance contract delivery and project success. These recommendations include suggesting providing comprehensive training in contract management practices to reduce unlawful terminations; implementing robust contract management protocols for clear communications; and developing financial planning strategies to mitigate budget deficits. The implications for both industry and academia include a call for more robust management frameworks to prevent project failures and reduce the frequency of contract terminations.
Downloads
References
[1] A. Wright, “From slaves to contract workers: Genealogies of consent and security in Indian Labor Migration,” Journal of World History, vol. 32, no. 1, pp. 29-43, 2021.
[2] C. A. Davis, and D. R. Smith, “All good things must come to an end: Legal issues in construction contract Termination,” in 2010 Construction Law Conference September 23-24, 2010 Belo Mansion, Dallas Texas.
[3] A. El Karriri, M. Yasin, and A. Alhabeel, “Investigating key drivers for contract termination in construction project in Gaza strip,” The Islamic University Journal, vol. 19, no. 1, pp. 179-195, 2011.
[4] O. C. Ade-Ojo, J. A. Akinola, B. T. Arijeloye, and O. S. Gabriel, “Implication of construction contract termination for Infrastructural Development in Ekiti State Local Government Areas, Nigeria,” FUTY Journal of the Environment, vol. 11 no.1, pp. 32-40, 2017.
[5] J. Caravella, “Five reasons that may justify termination of your contract agreement,” The Law Offices of John Caravella, P.C.- Long Island Const. Attorney-N.Y., Arch. Lawyer. N.Y. City. 2021.
[6] C. E. Coleman, E. M. Mwanaumo, and R. A. Rahman, “Indicators of failing projects: The Case of public construction,” in AIP Conference Proceedings, vol. 2688, p. 030009, 2023.
[7] F. Elliot, “Termination: Managing the way out of a contract,” 2021. https://www.fenwickelliott.com/research- insight/annual-review/2020/termination-managing-way-out-of- contract, accessed 02/11/2023
[8] U. B. H. Wilson, and D. S. S. Hadikusum, “Road project termination and rebidding strategies in Nigeria,” Journal of Financial Management of Property and Construction, vol. 20, no. 3, pp. 208-234, 2015.
[9] J. A. Raelin, and R. Balachandra, “R&D Project termination in High-Tech Industries,” IEEE Transactions on Engineering Management, vol. 1, pp. 16-23, 1985.
[10] D. Cudlipp, J. Candice, “Construction focus: Delay damages and termination-order is restored,” Property Law Journal, no. 390, 2021
[11] J. Song, L. Jin, Y. Zhao, and W. Hu, “Using bargaining game model to negotiate compensation for the early termination of BOT highway projects,” Transportation Research Part A: Policy and Practice,” vol. 105, p. 197, 2017.
[12] D. V. Truong, and D. Thuy-Ninh, “Several legal issues on construction contract termination,” Journal of Science and Technology in Civil Engineering, vol. 11, no. 6, pp. 210-216, 2017.
[13] J. R. Meredith, and S. J. Jr. Mantel, “Project management: a managerial approach,” New York: Wiley, 2009.
[14] C. George, “Understanding the concept of project termination in the management of projects,” International Journal of Science and Research, vol. 9, no. 3, pp. 107-111, 2020.
[15] D. N. Abeynayake, and R. N. M. U. Kumara, “Effect of premature termination: Case Sri Lanka,” The Second World Const. Symposium, Socio-Econ Sustainability in Construction, 14-15 June 2013, Colombo, Sri Lanka.
[16] J. Biolchini, P. G. Mian, A. Candida, and C. Natali, Systematic review in Software Engineering, System Engineering and Computer Science Department COPPE/UFRJ, Technical Report ES, vol. 679, no. 5, p. 45, 2005.
[17] A. R. Radzi, N. F. Azmi, S. N. Kamaruzzaman, R. A. Rahman, and E. Papadonikolaki, “Relationship between digital twin and building information modeling: A systematic review and future directions,” Construction Innovation. 2023.
[18] H. Shafei, A.R. Radzi, M. Algahtany, and R.A. Rahman, “Construction 4.0 Technologies and decision-making: A systematic review and gap analysis,” Buildings, vol. 12, no. 12, p. 2206, 2022.
[19] A. M. Farouk, and R. A. Rahman, “Integrated applications of building information modeling in project cost management: A systematic review,” Journal of Engineering, Design and Technology, vol. 23, no. 1, pp. 287-305, 2023.
[20] J. S. Nachatar, A. A. Hussin, and A. Omran, “Frustration of contract in The Malaysian construction contract management,” International Journal of Engineering. Annals of the Faculty of Engineering Hunedoara, vol. 9, no. 3, p. 85, 2011.
[21] N. I. Elsawalhi, and K. A. Khalil Abu Eid, “Factors affecting termination of constriction contracts,” in Proceeding, 4th International Engineering Conference—Towards Engineering of 21st Century. Gaza, Palestine: Islamic University of Gaza.
[22] P. K. De, “Project termination practices in Indian industry: a statistical review,” International Journal of Project Management, vol. 19, pp. 19-126, 2001.
[23] J. Liu, R. Gao, and C. Y. J. Cheah, “Pricing mechanism of early termination of PPP projects based on real option theory,” Journal of Management in Engineering, vol. 33, no. 6, p. 04017035, 2017.
[24] J. Song, Y. Hu, and Z. Feng, “Factors influencing early termination of PPP Projects in China,” Journal of Management in Engineering, vol. 34, no. 1, p. 05017008, 2018.
[25] A. M. Ruslin, and H. Muhamad, “Analysis on contract termination of Government projects on construction work,” Eurasia: Economics & Business, vol. 7, p. 13, 2018.
[26] F. Cohen, and J. S. Wojak Jr., “Termination for convenience of construction contracts,” New York Law Journal, vol. 245, no. 30, 2011.
[27] D. Dilts, and K. Pence, “Impact of role in the decision to fail: An exploratory study of terminated projects,” Journal of Operations Management, vol. 24, pp. 378-396, 2006.
[28] M. I. A. Dief, K. Y. Almedalah, and A. S. Elwan, “Practical guide for termination of construction projects: Hands on application in FIDIC & NEC3 Contracts,” PM World Journal, vol. 5, no. 12, pp. 1-10, 2016.
[29] S. Laxsana, S. Abiramy, and A.F. Fayasa, “Measures to mitigate termination of construction contracts in Sri Lanka,” in Sandanayake, Y.G., Waidyasekara, K.G.A.S., Ramachandra, T. and Ranadewa, K.A.T.O. (eds). Proceedings of the 11th World Construction Symposium, 21-22 July 2023, Sri Lanka.
[30] K. M. Manuel, E. K. Lunder, and E.C. Lui, “Terminating contracts for the Government’s convenience: Answers to frequently asked questions,” in Congressional Research Service Report for Congress, vol. 43055, 2015.
[31] N.M. Nor, and M.S. Misnan, “Issues in termination of construction contract: Based on law cases,” International Journal of Research and Innovation in Social Science, vol. 8, no. 1, pp. 671-683, 2024.
[32] G. Sweis, R. Sweis, A. A Hammad, and A. Shboul, “Delays in construction projects: The case of Jordan,” International Journal of Project Management, vol. 26, no. 6, pp. 665-674, 2008.
[33] H. Abdul-Rahman, R. Takim, and W. S. Min, “Financial-related causes contributing to project delays,” Journal of Retail & Leisure Property, vol. 8, pp. 225-238, 2009.
[34] N. A. Kartam, and S. A. Kartam, “Risk and its management in the Kuwaiti construction industry: Contractors' Perspective,” International Journal of Project Management, vol. 19, no.6, pp. 325-35, 2001.
[35] C. Amoatey, “Analyzing delay causes and effects in Ghanaian state housing construction projects,” International Journal of Managing Projects in Business, vol. 8, no. 1, pp. 198-214, 2015.
[36] D. Mac-Barango, “Construction project abandonment: An appraisal of causes, effects and remedies,” World Journal of Innovation and Modern Technology, vol. 1, no. 1, pp. 1-10, 2017.
[37] A. Rameli, J. Foziah, and C. S. Ho, “Responsiveness of the Malaysian planning system in managing housing supply,” In International Conference on Sustainable Housing (ICSH),” 2006, University Sains Malaysia, Penang, Malaysia.
[38] D. Osei-Asibey, J. Ayarkwa, A. Acheampong, E. Adinyira, and P. Amoah, “Stakeholders’ compliance with existing construction Health and Safety related laws and regulations in Ghana,” Journal of Building Construction and Planning Research, vol. 9, pp. 138-159, 2021.
[39] A. Stretton, “Relating Causes of project failure to an organizational strategic business frame-Work,” PM World Journal, vol. 7, no. 1, pp. 1-10, 2018.
[40] National Audit Office, The termination of the PFI contract for the National Physical Laboratory, Fifteenth Report of Session, Committee of Public Accounts, London: The Stationery Office Limited, 2007.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 The Author(s)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.