Risk Management: Identification and Mitigation in Maintenance Project During COVID-19 Outbreak (A Case Study in Telco Maintenance Project)

Authors

  • W. Tripiawan School of Industrial Engineering, Telkom University, Indonesia
  • W.F. Frestikawati Production Engineering – PT Inti, Indonesia

DOI:

https://doi.org/10.15282/jmmst.v5i2.6852

Keywords:

Risk Management, Risk Mitigation, Project Maintenance

Abstract

The continuity and smooth running of the telecommunications system plays an important role during this pandemic. The smooth running of the telecommunications system cannot be separated from the maintenance function of the equipment used to support the telecommunications system. PT. HIJ is one of the partners of the company PT. Telekomunikasi Indonesia, which is engaged in the maintenance of telecommunications equipment. One of the projects handled by PT. HIJ is a telecommunications equipment maintenance project in the East Java area network. As is known, in a telecommunications equipment maintenance project there are several risks that have an impact on the completion of the project. The results of the identified risk assessment will be developed further into risk mitigation, i.e. actions that can reduce the identified risk. As a result of the research, five risk aspects were identified: maintenance, finance and accounting, human resources (HR), procurement, and operational. According to the risk assessment result, there are 19 risks that can be classified based on risk level, with 7 in the moderate level of risk, 5 in the high level of risk, and 7 in the extreme level of risk. As a result of the research, it is suggested that risk mitigation be implemented for 5 risks with a high level of risk and 7 risks with an extreme level of risk.

References

N. Veligura, K. Ka-Ki Chan, F. van Ingen, and G. Cufre, "COVID-19’s Impact on the Global Telecommunications Industry". International Financial Corporation (IFC). 2020. Retrieved from [https://www.ifc.org/wps/wcm/connect/industry_ext_content/ifc_external_corporate_site/infrastructure/resources/covid-19+impact+on+the+global+telecommunications+industry]

Telin Insight (2020). How To Manage Traffic Explosion and Gain User Conversion During The Pandemic.[White paper]

M. S. B. Ahmed Abd El-Karim, O. A. M. El Nawawy & A. M. Abdel-Alim (2017), "Identification and assessment of risk factors affecting construction projects," HBRC Journal, 13:2, 202-216.

Project Management Institute. 2017. A Guide to the Project Management Body of Knowledge (PMBOK). United States: PMI Publications.

D. Pratami, F. Fadlillah, I. Haryono, A. R. Bermano (2018), “Designing Risk Qualitative Assessment on Fiber Optic Instalation Project in Indonesia”, International Journal of Innovation in Enterprise System. Vol. 2 No. 2, pp 44-56.

R A Bahamid and S I Doh (2017), " A review of risk management process in construction projects of developing countries", IOP Conf. Ser.: Mater. Sci. Eng. Vol. 271. 012042.

Downloads

Published

25-08-2021

How to Cite

Tripiawan, W., & Frestikawati, W. . (2021). Risk Management: Identification and Mitigation in Maintenance Project During COVID-19 Outbreak (A Case Study in Telco Maintenance Project). Journal of Modern Manufacturing Systems and Technology, 5(2), 52–58. https://doi.org/10.15282/jmmst.v5i2.6852

Issue

Section

Articles