1.
Zaini S, Abu M. Assessment the capacity utilization of mature and immature area of replanting using time driven activity-based costing. JMMST [Internet]. 2020 Sep. 30 [cited 2024 Nov. 21];4(2):7-11. Available from: https://journal.ump.edu.my/jmmst/article/view/4883