Zaini, S.N.A.M., and M.Y. Abu. “Implication of Time Equation in Mature and Immature Area of Ramp Using Time Driven Activity-Based Costing”. Journal of Modern Manufacturing Systems and Technology 4, no. 2 (September 30, 2020): 36–39. Accessed November 21, 2024. https://journal.ump.edu.my/jmmst/article/view/4884.