Zaini, S.N.A.M., and M.Y. Abu. “Assessment the Capacity Utilization of Mature and Immature Area of Replanting Using Time Driven Activity-Based Costing”. Journal of Modern Manufacturing Systems and Technology 4, no. 2 (September 30, 2020): 7–11. Accessed November 23, 2024. https://journal.ump.edu.my/jmmst/article/view/4883.