[1]
S. Zaini and M. Abu, “Implication of time equation in mature and immature area of ramp using time driven activity-based costing”, JMMST, vol. 4, no. 2, pp. 36–39, Sep. 2020, doi: 10.15282/jmmst.v4i2.4884.