Zaini, S. and Abu, M. (2020) “Implication of time equation in mature and immature area of ramp using time driven activity-based costing”, Journal of Modern Manufacturing Systems and Technology, 4(2), pp. 36–39. doi: 10.15282/jmmst.v4i2.4884.