Zaini, S. and Abu, M. (2020) “Assessment the capacity utilization of mature and immature area of replanting using time driven activity-based costing”, Journal of Modern Manufacturing Systems and Technology, 4(2), pp. 7–11. doi: 10.15282/jmmst.v4i2.4883.