Zaini, S.N.A.M., and M.Y. Abu. 2020. “Implication of Time Equation in Mature and Immature Area of Ramp Using Time Driven Activity-Based Costing”. Journal of Modern Manufacturing Systems and Technology 4 (2):36-39. https://doi.org/10.15282/jmmst.v4i2.4884.