ZAINI, S.; ABU, M. Implication of time equation in mature and immature area of ramp using time driven activity-based costing. Journal of Modern Manufacturing Systems and Technology, [S. l.], v. 4, n. 2, p. 36–39, 2020. DOI: 10.15282/jmmst.v4i2.4884. Disponível em: https://journal.ump.edu.my/jmmst/article/view/4884. Acesso em: 6 may. 2024.