ZAINI, S.; ABU, M. Assessment the capacity utilization of mature and immature area of replanting using time driven activity-based costing. Journal of Modern Manufacturing Systems and Technology, [S. l.], v. 4, n. 2, p. 7–11, 2020. DOI: 10.15282/jmmst.v4i2.4883. Disponível em: https://journal.ump.edu.my/jmmst/article/view/4883. Acesso em: 8 may. 2024.