Zaini, S., & Abu, M. (2020). Implication of time equation in mature and immature area of ramp using time driven activity-based costing. Journal of Modern Manufacturing Systems and Technology, 4(2), 36–39. https://doi.org/10.15282/jmmst.v4i2.4884