Zaini, S., & Abu, M. (2020). Assessment the capacity utilization of mature and immature area of replanting using time driven activity-based costing. Journal of Modern Manufacturing Systems and Technology, 4(2), 7–11. https://doi.org/10.15282/jmmst.v4i2.4883