1.
Zamrud N, Abu M. COMPARATIVE STUDY: ACTIVITY BASED COSTING AND TIME DRIVEN ACTIVITY BASED COSTING IN ELECTRONIC INDUSTRY. JMMST. 2020;4(1):68-81. doi:10.15282/jmmst.v4i1.3840