(1)
Zaini, S.; Abu, M. Implication of Time Equation in Mature and Immature Area of Ramp Using Time Driven Activity-Based Costing. JMMST 2020, 4 (2), 36-39. https://doi.org/10.15282/jmmst.v4i2.4884.