(1)
Zaini, S.; Abu, M. Assessment the Capacity Utilization of Mature and Immature Area of Replanting Using Time Driven Activity-Based Costing. JMMST 2020, 4 (2), 7-11. https://doi.org/10.15282/jmmst.v4i2.4883.