[1]
Zaini, S. and Abu, M. 2020. Implication of time equation in mature and immature area of ramp using time driven activity-based costing. Journal of Modern Manufacturing Systems and Technology. 4, 2 (Sep. 2020), 36–39. DOI:https://doi.org/10.15282/jmmst.v4i2.4884.