[1]
Zaini, S. and Abu, M. 2020. Assessment the capacity utilization of mature and immature area of replanting using time driven activity-based costing. Journal of Modern Manufacturing Systems and Technology. 4, 2 (Sep. 2020), 7–11. DOI:https://doi.org/10.15282/jmmst.v4i2.4883.