A. Malik, Z. and Jack Kie, C. (2017) “USING SYSTEM DYNAMICS SIMULATION TO UNDERSTAND THE FEEDBACK PROCESS IN A CONSTRUCTION PROJECT”, International Journal of Industrial Management, 3(1). Available at: https://journal.ump.edu.my/ijim/article/view/10867 (Accessed: 30 June 2024).