[1]
“Constructing a new cost structure using time-driven activity-based costing for replanting at palm oil plantation”, IJETS, vol. 7, no. 1, pp. 55–69, Feb. 2021, doi: 10.15282/http://dx.doi.org/10.15282/ijets.7.1.2020.1006.