[1]
“Development a new costing structure using time driven activity-based costing for palm oil plantation”, IJETS, vol. 7, no. 1, pp. 11–25, Jan. 2021, doi: 10.15282/http://dx.doi.org/10.15282/ijets.http://dx.doi.org/10.15282/ijets.7.1.2020.10027.1.2020.1002.