“Constructing a new cost structure using time-driven activity-based costing for replanting at palm oil plantation” (2021) International Journal of Engineering Technology and Sciences, 7(1), pp. 55–69. doi:10.15282/http://dx.doi.org/10.15282/ijets.7.1.2020.1006.