“Constructing a New Cost Structure Using Time-Driven Activity-Based Costing for Replanting at Palm Oil Plantation”. 2021. International Journal of Engineering Technology and Sciences 7 (1): 55-69. https://doi.org/10.15282/http://dx.doi.org/10.15282/ijets.7.1.2020.1006.