Development a new costing structure using time driven activity-based costing for palm oil plantation. International Journal of Engineering Technology and Sciences, [S. l.], v. 7, n. 1, p. 11–25, 2021. DOI: 10.15282/http://dx.doi.org/10.15282/ijets.http://dx.doi.org/10.15282/ijets.7.1.2020.10027.1.2020.1002. Disponível em: https://journal.ump.edu.my/ijets/article/view/4012. Acesso em: 7 jun. 2025.