Constructing a new cost structure using time-driven activity-based costing for replanting at palm oil plantation. (2021). International Journal of Engineering Technology and Sciences, 7(1), 55-69. https://doi.org/10.15282/http://dx.doi.org/10.15282/ijets.7.1.2020.1006