Development a new costing structure using time driven activity-based costing for palm oil plantation. (2021). International Journal of Engineering Technology and Sciences, 7(1), 11-25. https://doi.org/10.15282/http://dx.doi.org/10.15282/ijets.http://dx.doi.org/10.15282/ijets.7.1.2020.10027.1.2020.1002