1.
Development a new costing structure using time driven activity-based costing for palm oil plantation. IJETS. 2021;7(1):11-25. doi:10.15282/http://dx.doi.org/10.15282/ijets.http://dx.doi.org/10.15282/ijets.7.1.2020.10027.1.2020.1002