(1)
Constructing a New Cost Structure Using Time-Driven Activity-Based Costing for Replanting at Palm Oil Plantation. IJETS 2021, 7 (1), 55-69. https://doi.org/10.15282/http://dx.doi.org/10.15282/ijets.7.1.2020.1006.