[1]
2020. A case study on the determination of unused capacity using time driven activity-based costing for electronic component. International Journal of Engineering Technology and Sciences. 7, 2 (Sep. 2020), 74–85. DOI:https://doi.org/10.15282/ijets.7.2.2020.1006.