[1]
2021. Constructing a new cost structure using time-driven activity-based costing for replanting at palm oil plantation. International Journal of Engineering Technology and Sciences. 7, 1 (Feb. 2021), 55–69. DOI:https://doi.org/10.15282/http://dx.doi.org/10.15282/ijets.7.1.2020.1006.