[1]
2021. Development a new costing structure using time driven activity-based costing for palm oil plantation. International Journal of Engineering Technology and Sciences. 7, 1 (Jan. 2021), 11–25. DOI:https://doi.org/10.15282/http://dx.doi.org/10.15282/ijets.http://dx.doi.org/10.15282/ijets.7.1.2020.10027.1.2020.1002.