Underlying Causes of Construction Project Delay: A Review

Authors

  • N. A. Romzi Faculty of Civil Engineering Technology, University Malaysia Pahang, 26300 Gambang, Pahang, Malaysia.
  • S. I. Doh Faculty of Civil Engineering Technology, University Malaysia Pahang, 26300 Gambang, Pahang, Malaysia.

DOI:

https://doi.org/10.15282/construction.v2i2.7775

Keywords:

Construction Project, Delay

Abstract

Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project is delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. Similarly, other construction projects in different countries are prone to face delays. The aim of this study is to summarise the causes of delay in the construction project from previous study. Regarding the causes of construction project delay, the major countries in the world have faced slow decision making, poor site management and supervision, shortage of labour, changes of scope of work during construction, late in revising and approving design documents, etc. The identification of important delay causes helps a contractor to plan well before the project start.

Downloads

Published

2022-10-11

How to Cite

Romzi, N. A., & Shu Ing, D. (2022). Underlying Causes of Construction Project Delay: A Review. CONSTRUCTION, 2(2), 07–11. https://doi.org/10.15282/construction.v2i2.7775